A data center build is a large construction project with an unusually dense schedule and a lot of contractors working the same area at once. The safety equipment and the safety people that job needs are the ones we already rent and staff.

What we bring

Equipment and oversight for a crowded schedule

These are the parts of our fleet and our personnel roster that apply.

Work at height

Fall protection, inspected

Full-body harnesses, shock-absorbing lanyards, leading-edge self-retracting lifelines from 8 to 130 feet, and anchorage hardware. Every unit is inspected before it leaves the yard, and we inspect and recertify fall protection gear, including your own.

Hot work

A watch with the right gear

Fire watch attendants with the gas monitoring and extinguishing equipment the permit calls for, and the authority to stop work.

Permit control

One point of authorization

Permit-to-work coordinators who issue, verify and close permits for confined entry, hot work, line breaking, electrical work and working at heights.

Atmosphere

Monitoring where a space is closed

Personal and area multi-gas monitors for O2, CO and LEL, plus alarm networks where an enclosed space needs continuous coverage.

Temporary light and power

Light that arrives with the crew

LED brick lights for large-area illumination, low-profile lights for restricted spaces, and NEMA-rated cords, splitters and accessories.

Comms and welfare

Radios, cameras, trailers

Two-way Hytera radios running on their own frequencies, inspection and thermal cameras, emergency shower and eyewash trailers meeting ANSI Z358.1, cool down trailers, and mobile office trailers with Starlink.

The problems we solve

What a data center build needs from us

On a build this dense, most safety failures are coordination failures.

Trade stacking

Permits written in parallel stop being true

A dozen contractors in one hall means the conditions a permit describes can change before the work starts.

Our answer

A permit-to-work coordinator as the single point of control, verifying that work conditions still match the permit before the crew starts.

Hot work near finished work

An ignition source in a room full of cable

Welding, cutting and grinding near completed containment is where a small mistake becomes an expensive one.

Our answer

A trained fire watch on station for the whole watch and the post-work period, with the monitoring and suppression gear the permit requires.

Enclosed spaces

Pits, tanks and plenums that are permit spaces

Mechanical and electrical rooms, sumps and thermal storage tanks are confined spaces whether or not they are labeled that way.

Our answer

Gas monitors, blowers sized to the opening, retrieval rigged before entry, and an attendant outside.

Schedule pressure

Second shifts working in the dark

When the program slips, work moves to hours the permanent lighting is not ready for.

Our answer

Portable LED lighting and rated power runs that set up in the space the crew is actually in.

Prequalified and compliant

  • ISNetworld Member Contractor
  • American Petroleum Institute
  • Compliance Verified

Why Tiger

The safety program, not just the gear

We rent the equipment and we can staff the program that governs it, which on a build with this many contractors is usually the harder half.

One order for equipment and people.

Attendants, fire watch, permit coordinators and site safety professionals schedule alongside the rental.

Hazard-rated equipment as standard.

Our blowers, lighting and radios come in versions rated for classified locations, which removes the argument about whether the standard unit will do.

Program discipline.

Our safety professionals run job safety analyses, audits, inspections, permit systems and site-specific HSE programs, which is what a multi-contractor site needs.

24/7 dispatch.

Call dispatch with the location and the timeline and we will confirm a delivery window for your job.

Safety & QHSE

The Tiger Safety & Reliability Difference

Our GEAUX TIGER SAFETY 6S Program

From the shop floor to your jobsite, our 6S process (Sort, Set-In-Order, Shine, Standardize, Sustain, Safety) ensures equipment is ready, organized, and safe. It reduces downtime, non-productive time (NPT), and HSE risk, and keeps your project on track.

Technical Support & Troubleshooting

We do not just rent gear to companies. Tiger field crews help you maximize uptime and data quality on every job.

Fast, Transparent Communication

From quote to logistics to on-site handover, our team provides unfiltered, timely updates, so you always know where your equipment stands.

Explore our Safety & QHSE program

Frequently asked questions

What does Tiger provide on a data center construction project?

Safety equipment rentals and safety personnel. On this kind of build that usually means fall protection, gas detection, temporary lighting, radios, welfare trailers, and the attendants, fire watch and permit coordinators who run the program.

Can Tiger run the permit-to-work system for a multi-contractor site?

Yes. Permit-to-work coordinators act as the central point of control for hazardous work authorization, issuing and closing permits, verifying conditions on site, and keeping the records an audit will ask for.

Do you supply eyewash and shower units?

Yes, as trailers. They meet ANSI Z358.1 including tempered water, and they set up as a self-contained enclosure, which suits a site where permanent plumbing is not in yet.

How is the equipment ordered?

Call dispatch or send a quote request with the site, the scope and the dates. Dispatch runs 24/7. Equipment and personnel can go on the same request.